On the 800 block of S. Inglewood Avenue, two projects have been going up side by side. On the west side is Franklin Park at 807, where the City has replaced an aging play structure with something Redondo Beach has never had. At 850 is a 62,000-square-foot building on the former Franklin Elementary School site, finishing its last details before a winter opening.
The first of the two opens this afternoon. At 3 p.m. on Thursday, November 5, the City holds a ribbon cutting for its first all-accessible play space, designed for children of all abilities. The second, the Friendship Foundation's campus, follows over the next few months. The two projects are connected. The building next door helped shape the playground.
A playground designed with its neighbor in the room
Councilmember Paige Kaluderovic's district includes Franklin Park. She and City staff brought together a stakeholder group to design the new play space, and the City's April 2026 staff report lists who was on it:
- people who use the park
- occupational therapists and other developmental professionals
- parents and family members of children with disabilities who come to the park
- Public Amenities Commissioners Lang, Caldwell and Galassi, from the Franklin Park Playground Subcommittee
- a representative from the Friendship Foundation, which the report describes as "building a facility adjacent to the park that will provide services for individuals with special needs"
The group met over several months. Its brief was a play space that appeals to children of all abilities and makes the most of "the limited space that is available for its installation." The new playground keeps the old one's footprint and takes nothing from the rest of the park. Franklin is a 3.7-acre neighborhood park, so the design is compact and packed tight.
The City Council approved the final design unanimously on December 2, 2025. Patch reported that Kaluderovic called it "beautiful" and said it was "exceeding my expectations." Community Services Director Elizabeth Hause told the council the design included "almost all" the amenities the working group had asked for.
What's on the new play space
The December 2025 design report describes a main structure with low-level ramps, slides, a platform rocker, climbers and sensory boards. Because the footprint is small, the designers put stand-alone pieces around the edge to "fit as many engaging pieces in the area as possible." Those pieces are a spinner, sensory panels with chimes, and a colorful feature that casts shadows.
The design also includes these details:
| Detail | What the design report says |
|---|---|
| Color palette | Chosen to be "inviting and fun, but not too bright for those with visual sensitivities" |
| Shade | A new large shade structure in the center, matched to the existing blue GameTime shades around the play area |
| Surfacing | Rubberized surfacing replaces the old ground cover |
| LA Kings tie-in | An interactive scavenger hunt built around crowns and paw prints for Bailey, the Kings mascot |
The shade structure is easy to overlook, but it matters. The blue canopies already around the play area came from GameTime, the same company that made the new equipment. The design report says the colors and design will match, so the old shade and the new center structure form one layout.
How the cost came in below the budget
The City set aside $500,000 for the project in its FY 2024-25 Capital Improvement Program. Two outside contributions brought the cost down. The first was a joint grant from the California Parks and Recreation Society and GameTime that took 50% off the price of the playground equipment. The December 2025 staff report puts that discount at $99,060 for this project.
The second was a $75,000 donation from the LA Kings Foundation, which is where the crown-and-paw-print scavenger hunt comes from.
In April 2026, staff recommended a purchase-and-installation agreement with Playcore Wisconsin, which does business as GameTime, for $394,856.32. That price covers removing the old structure and surfacing, installing the new equipment, and laying the rubberized surface. Staff wrote that with the Kings donation, about $180,000 of the original $500,000 could go toward other improvements at Franklin Park. At the December vote, Patch quoted Councilmember Zein Obagi's two-word review: "Under budget."
The opening came later than first planned. When the design was approved, Patch reported a summer 2026 opening, and the April report aimed to finish by September 30. The City's Franklin Park page said construction would start on Thursday, August 27 and take several months. The ribbon cutting is today.
The second opening on the block
Across from the playground, the Daily Breeze reports that the Friendship Campus: The Greenberg Family/Skechers Center at 850 S. Inglewood Ave. is a $70 million, 62,000-square-foot campus for job training and placement for people with special needs. Plans include a Culinary Arts Center, a Creative Arts Studio, the Friendship Cafe, work-based learning classrooms and a Vocational Pathways Program. The Friendship Foundation is based in Manhattan Beach.
Easy Reader News reported on October 2 that a soft opening was expected by early December. The public grand opening is set for January 21, 2027, a date Skechers' October release also uses.
The vocational program already reaches beyond the building. The Friendship Foundation built it with Els for Autism, the nonprofit pro golfer Ernie Els founded. According to the Daily Breeze, pilot placements included shipping logistics at APM Terminals and native plant restoration at Wilderness Park for the City of Redondo Beach. Other organizations named in that coverage include Skechers, Kinecta Federal Credit Union, Gensler, Lakeshore Learning, Rock & Brews and the Palos Verdes Peninsula Land Conservancy.
Yossi Mintz of the Friendship Foundation told Easy Reader News that Vocational Pathways is "the linchpin" of the campus. He also said, "Our phones are ringing off the hook," describing interest from organizations that want to work with the program.
By the end of January, then, this block will have an all-abilities playground on one side of Inglewood Avenue and an all-abilities job-training campus on the other. The playground's designers planned for that. Their stakeholder group included the neighbor.
Where Franklin fits in North Redondo's park calendar this winter
The playground also opens at a useful moment. A few minutes away, Fulton Playfield is closed for the City's Fulton Playfield Multi-Benefit Infiltration Project, a stormwater job that Griffith Company is carrying out at the detention basin. The City's project schedule runs well into 2027:
- Through November 30, 2026: Fulton Playfield fully closed. Franklin's new playground opens November 5.
- December 2026 to January 2027: Fulton partly reopens. The Friendship Campus soft opening is expected in early December.
- January 21, 2027: The Friendship Campus grand opening.
- February to April 15, 2027: Fulton fully open, with work paused for the LA County rainy-season deadline.
- April 16 to June 3, 2027: Fulton closes again while crews improve the detention basin.
The rest of Franklin Park
The playground sits inside a park that already gets plenty of use. The City's Franklin Park page lists two courts shared by basketball and pickleball, two shuffleboard courts, restrooms and picnic areas. The courts are first come, first served, with posted play times. They have pickleball lines, but the City doesn't provide nets or other pickleball gear.
Franklin is also one of three Redondo parks with reservable moon-bounce areas, along with Anderson Park and Alta Vista. Franklin has two, and each can be booked for a morning block from 8 a.m. to 1 p.m., an afternoon block from 2 to 7 p.m., or both. Reservations are made online. They open six months ahead and must be made at least three weeks before the date. A moon-bounce booking doesn't hold a picnic table. Tables are first come, first served, and you can't save one with a sign.
Manhattan Beach went through something similar when the lower playground at Polliwog Park reopened with ADA-accessible structures after a ribbon cutting on September 26, 2023. Franklin is the first all-accessible play space in Redondo Beach, built on the same block as a campus that will serve people with disabilities into adulthood.
For more on North Redondo's parks, markets and neighborhood blocks, see our Redondo Beach neighborhood guide and our look at the Wednesday farmers market on Green Lane.
At Amy Pearce, we follow changes like the ones on Inglewood Avenue because they shape everyday life on a block well before they show up in a home's value. If you live near Franklin Park and want to know what your home is worth, we're glad to talk it through, starting with a free home valuation.